Professional Practical Tips: Deeply Explore the Full Lifecycle Value of Equipment
1.Precise selection of working conditions: Based on the working radius and lifting capacity requirements, the boom length is scientifically combined. For comprehensive coverage operations in super high-rise buildings, the 80m fully extended mode is selected; for heavy-load operations on bridge tower columns, the 30m short boom mode is chosen, maximizing the equipment's carrying efficiency.
2. Safety Management for High-altitude Operations: Before the operation, a lifting plan must be formulated based on the current wind speed (not exceeding the limit of 12m/s). For wind farms and super-tall buildings, additional wind-resistant measures need to be implemented. The tri-level safety system's hierarchical protection function should also be activated.
3. Efficiency optimization operation procedures: For large-tonnage lifting operations, the 4x speed reduction gear is preferred to ensure safety. When the hook is returning, the 2x speed high gear is switched to enhance efficiency. When precise alignment is required, the worm gear positioning mode is activated to reduce adjustment time.
4. Full-cycle maintenance strategy: Regularly inspect the telescopic cylinder, pulley system and hydraulic pipelines. Pay special attention to the structural condition of the welded parts. After the operation, promptly clean the debris on the boom and take anti-rust measures to extend the service life and safety redundancy of the equipment.
Customer benefits
The chief engineer of a certain super high-rise project stated: "When constructing the core tube of a 300-meter high office building, the most troublesome issues are the relocation of the tower crane and the accuracy of the lifting. Previously, we used multi-section arm tower cranes, and every time we completed two standard floors, we needed to relocate and debug. This alone accounted for 15% of the total construction period. After replacing with Xiangyu Baoyuan's 300-meter four-section arm tower crane, the 80-meter arm length can cover the entire standard floor at once, eliminating the need for repeated relocation. The positioning accuracy of the steel columns during lifting reached the millimeter level, and the overall core tube lifting period was shortened by 20%. More importantly, it has good wind resistance, and during operations at a height of 300 meters, the structural stability far exceeded expectations, significantly reducing the pressure of safety management." Xiangyu Baoyuan has been deeply engaged in the field of engineering equipment and has a profound understanding of the core contradictions in high-altitude lifting. This 300-meter four-section arm truck-mounted crane not only is a high-performance lifting equipment but also is the core carrier for promoting the efficiency upgrade and cost optimization of high-altitude engineering, providing full-cycle value solutions for super high-rise, wind power, bridge and other fields.