Model No.: xca220
Brand: xiangyu baoyuan
Status: New
Applicable Industry: Hotels, Restaurant, Food &Amp; Beverage Shops, Home Use, Garment Shops, Building Material Shops, Food Shop, Retail, Advertising Company, Other, Printing Shops, Machinery Repair Shops, Construction Works, Manufacturing Plant, Food &Amp; Beverage Factory, Energy &Amp; Mining, Farms
Out-of-warranty Service: Online Support
Video Factory Inspection: Provided
Mechanical Test Report: Provided
Place Of Origin: China
Service System: Online Support, Video Technical Support
Transportation: Ocean,Land,Air,Express
Place of Origin: CHINA
Port: ShangHai,QingDao,LianYunGang
Payment Type: L/C,D/P,D/A
Incoterm: FOB,CFR,EXW
XCA220 truck crane's second-section auxiliary boom: Solving the problem of long-distance and high-altitude lifting
In high-altitude lifting operations, the insufficient length of the main boom makes it difficult to cover complex working conditions, which is a common pain point in the industry. When conducting construction on high-rise buildings or power tower structures, you often have to repeatedly adjust the equipment position due to insufficient lifting radius.
To address this problem, Xiangyu Baoyuan has launched the Two-section auxiliary boom for truck crane XCA220, providing a professional solution. Through efficient hinging cooperation with the main boom, it can easily break through the limitations of lifting height and radius, significantly improving construction efficiency. As a professional component processing service provider, we have been deeply involved in the Truck-mounted Crane Parts field for many years, fully understanding the crucial role of these core components in lifting operations. We also provide high-standard processing services for Excavator Parts, Tower Crane Accessories, and other engineering machinery components.
The core value of this second-section auxiliary boom lies in extending the working radius and increasing the lifting height. After being hinged at the head of the main boom, it can be adapted to high-altitude working scenarios such as those in high-rise buildings and power tower structures. In narrow spaces like the installation of chemical equipment, it can flexibly avoid obstacles and achieve precise lifting. In long-distance lifting operations such as the assembly of high-voltage power towers, it can complete the task in one go, reducing the time loss caused by adjustment of working conditions. Its installed hydraulic control system can work in coordination with the main boom, ensuring the stability and fine motion accuracy of the lifting process. Even for precise lifting requirements, it can handle them with ease. In addition, we have integrated the precise processing concept of Aerial Work Vehicle Parts in our production to ensure the durability and adaptability of the components. Product features
1.Efficiently expand the lifting range and adapt to complex construction scenarios
2.Hydraulic collaborative control, balancing lifting stability and accuracy
Tips
1.Before installation, check the lubrication condition of the hinge joint between the main boom and the auxiliary boom
2.Before operation, conduct no-load debugging to confirm the normal operation of the hydraulic system
This auxiliary boom, with its outstanding performance, has become a reliable assistant for XCA220 truck crane in handling complex lifting tasks, providing reliable equipment support for engineering construction.